Documentation

  1. Development Plan - This document describes how each student team plans on completing their assigned project.
  2. Requirement Document - After interacting with project sponsors, students collect and create a detailed requirements document. This will form the basis for work they must complete by the end of the semester.
  3. Design Document - Once requirements have been collected, the student teams must design out how they will build their software. This includes a wealth of diagrams showing the flow of the various use cases their solution must support.
  4. Test Plan - The students must create a detailed test document demonstrating how to test the many use cases inside of their application.
  5. Deployment Document - Finally, the teams must document how to deploy their software onto a new piece of hardware.

Project Milestones

  1. Alpha - Students must present a working prototype demonstrating that they understand the requirements and have connected all the major components.
  2. Beta - Students present a near final version of their application. At this point, the applications should be feature complete and all that is left is testing, styling, and debugging.